Hey Guys, another question for the 5.8NA. can i use something like this for attaching the downhaul to the sail?
http://www.murrays.com/mm5/merchant.mvc?Screen=PROD&Store_Code=MS&Product_Code=56-9651&Category_Code=
This would allow me to leave the downhaul threaded through all the blocks and I can bungee the "u"-hooks to the mast when the sail is down/off and have a really quick connection for the downhaul when it is up. I have the factory downhaul set up that can be adjusted from both sides of the mast (7 to 1?).
I have a "bad" launching scenario where I cannot put the main up until I am clear of the launch ramp and associated docks (no beach near either). So the quicker I can rig the main on the water the better. Went out solo today and was OK, but getting the halyard ring on the masthead hook took longer than expected and I drifted for longer than I wanted. so anything to speed up raising/rigging the main is what Im looking for.
Again,
Thanks in advance for any answers/advice
Cheers!
Patrick
--
-PG
'95 Nacra 5.8NA , rule#2
--