DSCN0055_resize
This End Up, built in 1976 sail #400
Date: 08/16/2016
Views: 1044
|
Hull Repair and Improvements and Painting the Hulls
Date: 06/10/2016
Owner: Dave Graf
Size: 48 items
Views: 7990
|
Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.
Refinishing aluminum, rigging modifications, Cleaning up, sandblasting, precoating, priming and finishing aluminum mast, beams
Date: 06/10/2016
Owner: Dave Graf
Size: 52 items
Views: 3969
|
Tools and Supplies Used
Tools and Supplies Used
Date: 06/10/2016
Owner: Dave Graf
Size: 22 items
Views: 2783
|
Slide1
Date: 08/16/2016
Views: 890
|
Slide2
Date: 08/16/2016
Views: 913
|
DSCN0056
This End Up
Date: 06/07/2016
Views: 814
|
1975 5.2 poster
NACRA 5.2 Poster 1
Date: 09/06/2016
Views: 1028
|
1975 5.2 Poster, 2
Original 5.2 Poster
Date: 09/06/2016
Views: 926
|
Have You Ever Gone
Date: 09/18/2016
Views: 884
|
Regattta
Date: 09/18/2016
Views: 762
|
Would You Be Interested
Date: 09/18/2016
Views: 957
|
beachcat survey
Date: 10/04/2016
Views: 819
|
IMG_20161006_0001
Date: 10/06/2016
Views: 780
|
20161101_125234
This End Up with new square top sail.
Date: 11/01/2016
Views: 879
|
20161101_125221
Date: 11/01/2016
Views: 815
|
20161111_102546_resize
Date: 11/11/2016
Views: 870
|
20161111_102535_resize
Date: 11/11/2016
Views: 868
|
20161110_155923
5.2 Deck
Date: 03/28/2017
Views: 721
|
20170412_155031_resize
Front Beam End with new straps
Date: 04/12/2017
Views: 833
|
20170412_155047_resize
Rear Beam End with cool new shrink tubing straps
Date: 04/12/2017
Views: 1061
|
20170708_155754_resize
Date: 07/08/2017
Views: 867
|
20170708_155824_resize
Date: 07/08/2017
Views: 720
|
20170715_134453_resize
Original bronze lug and the resin area around the lug.
Date: 07/15/2017
Views: 748
|
20170715_134502_resize
Original bronze lug
Date: 07/15/2017
Views: 760
|
20170715_142433_resize
Modified bronze lug
Date: 07/15/2017
Views: 819
|
20170715_142427_resize
Top view of modified lug.
Date: 07/15/2017
Views: 820
|
20170715_142445_resize
Bronze lug sitting on cleaned up original base. The exposed hole is from a very thin area in the original glass work.
Date: 07/15/2017
Views: 820
|
20170716_105522_resize
2 layers 10 oz. below and 1 layer 10 oz. covering lug support.
Date: 07/16/2017
Views: 766
|
20170716_145344_resize
Bronze lug bedded in thickened epoxy and faired.
Date: 07/16/2017
Views: 762
|
20170716_151552_resize
1st layer of 10 oz. covering the lug. The bolt was noodled into the cloth, so long fibers surround the bolt.
Date: 07/16/2017
Views: 748
|
20170718_140039_resize
Use a punch or similar to open up the weave of the glass before installing a temporary bolt.
Date: 07/19/2017
Views: 751
|
20170716_140040_resize
Bronze lug bedded in thickened epoxy before fairing.
Date: 07/19/2017
Views: 735
|
20170905_080151_resize
Date: 09/05/2017
Views: 834
|
|
|