DSCN0055_resize
This End Up, built in 1976 sail #400
Date: 08/16/2016
Views: 1042
|
Hull Repair and Improvements and Painting the Hulls
Date: 06/10/2016
Owner: Dave Graf
Size: 48 items
Views: 7948
|
Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.
Refinishing aluminum, rigging modifications, Cleaning up, sandblasting, precoating, priming and finishing aluminum mast, beams
Date: 06/10/2016
Owner: Dave Graf
Size: 52 items
Views: 3932
|
Tools and Supplies Used
Tools and Supplies Used
Date: 06/10/2016
Owner: Dave Graf
Size: 22 items
Views: 2760
|
Slide1
Date: 08/16/2016
Views: 886
|
Slide2
Date: 08/16/2016
Views: 910
|
DSCN0056
This End Up
Date: 06/07/2016
Views: 813
|
1975 5.2 poster
NACRA 5.2 Poster 1
Date: 09/06/2016
Views: 1024
|
1975 5.2 Poster, 2
Original 5.2 Poster
Date: 09/06/2016
Views: 925
|
Have You Ever Gone
Date: 09/18/2016
Views: 883
|
Regattta
Date: 09/18/2016
Views: 760
|
Would You Be Interested
Date: 09/18/2016
Views: 954
|
beachcat survey
Date: 10/04/2016
Views: 817
|
IMG_20161006_0001
Date: 10/06/2016
Views: 777
|
20161101_125234
This End Up with new square top sail.
Date: 11/01/2016
Views: 876
|
20161101_125221
Date: 11/01/2016
Views: 813
|
20161111_102546_resize
Date: 11/11/2016
Views: 867
|
20161111_102535_resize
Date: 11/11/2016
Views: 864
|
20161110_155923
5.2 Deck
Date: 03/28/2017
Views: 720
|
20170412_155031_resize
Front Beam End with new straps
Date: 04/12/2017
Views: 830
|
20170412_155047_resize
Rear Beam End with cool new shrink tubing straps
Date: 04/12/2017
Views: 1058
|
20170708_155754_resize
Date: 07/08/2017
Views: 864
|
20170708_155824_resize
Date: 07/08/2017
Views: 717
|
20170715_134453_resize
Original bronze lug and the resin area around the lug.
Date: 07/15/2017
Views: 745
|
20170715_134502_resize
Original bronze lug
Date: 07/15/2017
Views: 758
|
20170715_142433_resize
Modified bronze lug
Date: 07/15/2017
Views: 816
|
20170715_142427_resize
Top view of modified lug.
Date: 07/15/2017
Views: 816
|
20170715_142445_resize
Bronze lug sitting on cleaned up original base. The exposed hole is from a very thin area in the original glass work.
Date: 07/15/2017
Views: 817
|
20170716_105522_resize
2 layers 10 oz. below and 1 layer 10 oz. covering lug support.
Date: 07/16/2017
Views: 764
|
20170716_145344_resize
Bronze lug bedded in thickened epoxy and faired.
Date: 07/16/2017
Views: 758
|
20170716_151552_resize
1st layer of 10 oz. covering the lug. The bolt was noodled into the cloth, so long fibers surround the bolt.
Date: 07/16/2017
Views: 745
|
20170718_140039_resize
Use a punch or similar to open up the weave of the glass before installing a temporary bolt.
Date: 07/19/2017
Views: 748
|
20170716_140040_resize
Bronze lug bedded in thickened epoxy before fairing.
Date: 07/19/2017
Views: 732
|
20170905_080151_resize
Date: 09/05/2017
Views: 832
|
|
|