IMG_5142
I installed a C Sherman Johnson Quick release Shroud Lever between the furling drum & forestay.
It is not required, but made a 10 second job out of tensioning the rig & jib.
This shows the system in the "rig tight" position. The lever is pulled down, & the grenade pin installed to safe it. The system is adjustable.
The green line is the jib halyard. Once rig is tensioned I just pull the green line & set it in the clamcleat.
|
|